Show simple item record

dc.rights.licenseCC-BY-NC-ND
dc.contributor.advisorZlatanova, S.
dc.contributor.advisorWasserman, N.
dc.contributor.authorVries, L. de
dc.date.accessioned2013-04-25T17:03:11Z
dc.date.available2013-04-25
dc.date.available2013-04-25T17:03:11Z
dc.date.issued2013
dc.identifier.urihttps://studenttheses.uu.nl/handle/20.500.12932/12957
dc.description.abstractBuilding Information Modeling (BIM) is an actual topic in the building industry and involves the full life cycle of an asset. The information that belongs to that asset changes during the life cycle and is used in different models and software. Therefor it is necessary to exchange data between different life cycle phases. This exchange of data involves a variety of characteristics and parameters that should be taken into account. Within this research a first attempt is made to reuse asset information throughout the life cycle with a minimal loss of information and suggestions are proposed for more structual solutions.
dc.description.sponsorshipUtrecht University
dc.format.extent15773906 bytes
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.titleA research towards completing the asset information life cycle - An analysis of the relationships between data exchange, BIM and the asset life cycle and the solutions to overcome existing issues at Amsterdam Airport Schiphol.
dc.type.contentMaster Thesis
dc.rights.accessrightsOpen Access
dc.subject.keywordsGIS, CAD, BIM, life cycle, AEC, modeling, data, 3D, exchange, asset management
dc.subject.courseuuGeographical Information Management and Applications (GIMA)


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record